Updating the Proven PDS 8 / PDS 80 -
DornerDatabase

Dorner database on an external computer
This solution provides the transfer of the master data management,
planning, loggings, batch protocol archiving, delivery note printing,
post-editing of delivery note, etc. to a computer. This extends
the life of your PDS 8 / PDS 80 control system, which has been well
proven for many years. Other control models may also be upgraded
with this database system. By using the Dorner database your system
becomes networkable and can be integrated in complex networks.
Functions
The master data administration (entering and changing customers,
construction sites, mixes, price surcharges, vehicles, zones, ....)
is carried out on the factory computer (MS-SQL database).
Systems data (discharge times, switch-off values, silo levels)
are maintained by the control system as before. Dispatches are entered
on the factory computer. With each vehicle assignment, a loading
order is passed to the control.
The order management and the printing of the delivery note is carried
out on the database computer. The batch protocols from the existing
control will be transferred, saved on the database computer, and
can be archived on a CD for example, if required. Sophisticated
statistics can be printed on the laser printer connected to the
database computer.
|