WIN10 and Devis visualisation at Holcim's Hüntwangen site

Hüntwangen is a huge gravel processing plant in what is probably the largest gravel mining area in Switzerland. Here, dornerControl controls 52 Profibus stations and 1500 digital and analogue inputs and outputs reliably and efficiently.

Within the scope of the update, the systems were expanded and optimised. Another 4 operator stations as well as an OPC interface to the Brecher controls were set up.

Thanks to the very good and effective preparation, the installation could be put into operation within 4 days.

 

47.5959731, 8.4920685