DornerBatch on the new Airport construction in Mexico in use

With this mammoth project, one of the largest airports in the world, with 6 runways, a symbol of modern Mexico is being built. Right next to the existing airport, in the new airport, glass and steel dominate the building with flowing shapes and futuristic design.

Facts: Area size: more than 500,000 m²

Passengers: 120 million per year

Costs: 7 billion euros

Construction time: 50 years

Lafarge Holcim, established in more than 90 countries, is a worldwide company in the construction industry and has equipped its first 2 plants in Mexico with DornerBatch. These two plants were installed by our local partner SIMEM and are used for the construction of the new airport – powered by Dorner.

DornerBatch – simple controlling – easy to use internationally - multilingual