New ready mix concrete plant in Linz works with dornerBatch

Swietelsky Baugesellschaft m.b.H., HABAU Group, Held & Francke Baugesellschaft m.b.H and Porr Bau GmbH built a new ready-mix concrete plant – set on the terrain of Treul in Steyregg by Linz.

Dorner Electronic delivered and installed the complete package of software solutions for this plant, which is supplied by Kaiser in Deutschfeistritz.

  • all production processes are controlled by dornerBatch.
  • dornerOptimize dispatch provides optimal order planning and truck fleet management including all on-board computer in all vehicles.
  •  dornerInvoice provide the key information at a glance - quotation preparation, through the management of terms and conditions, to invoice preparation, you receive all the relevant figures necessary for invoicing.
  • dornerLab forms an important interface between concrete plants and recipes.

The client got the personalized software and the complete networked software solutions from one provider.

 

 

48.309163810103, 14.28824672296