New Dorner Consistency Control at Fehr
The precast concrete plant of Fehr in France produces panels of ultra-high-strength fibre concrete, which are easy to insert and contain an external thermal insulation (ETI) system. There is no possibility to correct the consistency during the production, that is why Fehr counts on the dynamic and self-learning consistency control of DornerBatch. This is the only possibility to reach the target consistency precisely within every charge.
47.5380277, 7.7289624
Contact Dorner Electronic

Dorner Electronic GmbH
Kohlgrub 914
6863 Egg, Austria