Power plant project at an altitude of 2000 m with dornerControl

At an altitude of 2000 m, the Salzburger Sand- und Kieswerke control concrete production for the Tauernmoos power plant using dornerControl. SWIETELSKY is implementing this large Tauernmoos power plant, which represents a significant future cornerstone for the railway power supply. The total investment for the extension of the Stubachtal power plant group with the Tauernmoos pumped-storage power plant runs to approximately 300 million euros.

dornerControl permits the efficient and reliable management of production processes in concrete plants and mobile plants. The clear, individually customisable visualisation shows all relevant production factors at a glance. In total, approximately 50,000 m³ of sprayed concrete and 80,000 m³ of construction concrete will be installed by 2025.

In addition to dornerControl, the software solutions dornerOptimize and dornerLab are already in use at SSK.

47.1525955, 12.6441052